• Mail
  • Investor
  • Career
  • English English English en
  • Eesti Eesti Estonian et
Eleon
  • Home
  • About
    • Introduction
    • Technology
    • Factory
  • Projects
    • Salme Wind Park
    • Aidu Wind Farm
    • Development projects
  • Partners
  • Gallery
  • News
  • Contact
  • Search
  • Menu

The first 3M116 prototype wind turbine in Salme Wind Park

The first Eleon 3M116 prototype wind turbine was installed in Salme Wind Park, Saaremaa, at the end of 2013 and commissioned in March 2014. The reliability percentage of the Eleon turbine has been 98.8% since its first commissioning. Between 2015-2017, the Eleon 3M116 prototype test turbine produced 44 GWh of electrical energy.

Eleon 3 MW Wind Turbine
Rated output power
3 MW
Rotor diameter116 m
Hub height122 m
Blade tip height180 m
Construction of Salme Windpark
Construction of Salme Windpark
Construction of Salme Windpark
Construction of Salme Windpark
Construction of Salme Windpark
Construction of Salme Windpark

About

  • Introduction
  • Technology
  • Factory

Business

  • Partners
  • News
  • Investor

Contact

Pärnu maantee 10
10140, Tallinn, Estonia
KMKR: EE101360380
info@eleon.ee

Eleon © All rights reserved.
  • Mail
Construction of Aidu Wind Farm Aidu Wind Farm
Scroll to top